Technical advice
Environmental Due Diligence

Characterization plan and remediation project for the former Fibronit area

Project description

Drafting of the characterization plan and the final project for the remediation of the former Fibronit area of Bari, which is included in the National Plan of Contaminated Sites. TIA was responsible for core drilling, sampling and over 400 analyses to look for asbestos and metals in the soil and subsoil and outline the remediation project.

Client:
Immobiliare Beta
Site:
Former Fibronit Area – Bari (BA)
Year:
2005
crossmenuchevron-down
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.