Drafting of the characterization plan and the final project for the remediation of the former Fibronit area of Bari, which is included in the National Plan of Contaminated Sites. TIA was responsible for core drilling, sampling and over 400 analyses to look for asbestos and metals in the soil and subsoil and outline the remediation project.