Project description

As part of a programme to protect worker health, TIA conducted extraordinary remediation work at the Ansaldo Breda plant in Reggio Calabria, which had already undergone previous remediation activities.

During the operations, we removed false ceilings and completely cleaned dust containing asbestos fibres from the metal structures, systems, walls and floors in various production departments.

This work, which was done exclusively during the summer production break, required dedicated equipment and many specialized workers, as well as containment, suction and final testing procedures based on SEM analysis.

Client:
Ansaldo Breda
Site:
Ansaldo Breda Plant – Reggio Calabria (RC)
Year:
2015